Sirius project · Chingola, Zambia

From outsourced analysis to in-country analytical capability

An exploration operation in Zambia relied on commercial laboratories in South Africa for gold and multi-element analysis. Average analytical turnaround time was approximately 60 days.

ICP analysis in routine operation
ICP analysis in routine operation — Chingola, Zambia, 2026.

The operating question

Could in-country analytical capability shorten the information cycle while maintaining the required analytical capability?

Sending samples outside Zambia created a long information cycle between sampling and results. For an active exploration programme, the issue was how quickly reliable analytical information could get back to the people making decisions.

From requirement to operation

The response

Sirius assessed the analytical requirement and developed an in-country laboratory around expected sample demand and the required methods.

ASSESS → DESIGN → BUILD → COMMISSION → OPERATE

The work brought together workflow and infrastructure, equipment selection and installation, sample preparation, fire assay and ICP capability, recruitment and training, safety and quality systems, LIMS-supported sample tracking, commissioning and operational support.

Real project evidence

From requirement to routine operation

Training, construction, infrastructure, equipment installation and commissioning formed connected workstreams. This selected photographic record shows only the principal stages.

Requirement and capability development

Technical training during development of the Chingola laboratory
Technical training during development of the Chingola laboratory — Zambia, January 2026.

Construction

Laboratory facility during construction
Laboratory facility during construction — Chingola, March 2026.

Infrastructure

Fume-extraction equipment installation during laboratory fit-out
Fume-extraction equipment installation during laboratory fit-out — Chingola, April 2026.

Equipment and engineering

Dust-extraction infrastructure being installed in the sample-preparation area
Dust-extraction infrastructure being installed in the sample-preparation area — Chingola, May 2026.

Commissioning to operation

Fire-assay fusion in routine operation
Fire-assay fusion in routine operation — Chingola, September 2026.

Routine analytical operation

Analyst operating the ICP and workstation
Analyst operating the ICP and workstation — Chingola, 2026.

Operating laboratory

Completed laboratory facility in routine operation
Completed laboratory facility in routine operation — Chingola, September 2026.

What changed

The project shortened the information cycle between sampling and the exploration decision.

Sample collection → Analysis → Result → Exploration decision

Starting position
Outsourced gold and multi-element analysis involved an average turnaround of approximately 60 days.
Sirius response
Assess, design, build, commission and operate in-country analytical capability. Project photographs document the facility, people and analytical capability.
Operating result
Current operating performance averages approximately 10 days analytical turnaround time. The result is a shorter analytical information cycle and an operating laboratory in Zambia.
Evidence basis
The approximate turnaround averages are established operating results. Designed capacity and team size are supplied project figures. No cost-reduction comparison is presented.

One operating system

What this demonstrates

A laboratory’s performance depends on demand, workflow, capacity, equipment, people, quality and information systems working together. Sirius designs and improves these elements as one operating system.